Technical scheme and Installation of pallet film wrapping machine
2023-05-15
Technical scheme of pallet film wrapping machine
We recommend you to refer to your owner’s manual for a better understanding before operating the pallet film wrapping machine in order to achieve a better service for your company. Please contact us immediately in case of any uncertainties in the process so that we can offer a better service. We also appreciate your invaluable suggestions and comments on our products and service.
Installation
Check and find whether the machine, its components and accessories listed in the packing list are all included and find whether there is any damage to the machine. (Please immediately negotiate with relevant transporting departments or contact the delivering party in case of any damage mentioned above.)
2. Check the certified card to make sure that the product you purchased is qualified and meets your ordered requirements.
3. Open the package in the marked position (note: avoid any damage to the device); check the machine and its accessories, following the packing list.
4. Please read this user manual carefully before install, adjust and operate the machine.
5. This machine should be installed in a dry place where there is no dust, no leaking, no flammable or explosive chemical preparations or other things eroding.
The surrounding temperature should range from –10 to 50oc.
6. Setting up and assembly machine
6.1 Put the turntable part of this machine on a level up ground and erect the tower.
6.2 Connect the tower with the turntable properly. Use the spanner and four M16 Bolts to hold them together,
6.3 Install the ramp (optional, purchase independently) on the same level as the turntable; make sure that it is convenient for the loading and unloading of goods .
7 .Check other connecting parts to find whether the electric joint is less screwed or falls off. Please fix the less-screwing or falling-off accessories and wires in time.
8. A correct, stable, credible and fixed power supply is a must.
(Any temporary wire is prohibited.)
9. Connect generator wire with the down-lead of the sensor properly in accordance with relevant requirement. Only after the down-lead of the device is properly powered and a grounding test is carried out
can the test operation be conducted(Seeing the electric principle drawing (drawing2)). Pay attention to the positive and negative directions of the generator when connecting and make sure that the
operation is manual when confirming the running directions.
10. Check and find whether there is damage to the location-limiting switch and its arms and the location-limiting block, whether they are in proper position and are operative normally.
11. The chains and decelerator of the device have already been lubricated or oiled before leaving the manufacture, please confirm before operation.
12. The photoeye switch does not in process and the film carriage can up when no pallet goods on the turntable.
13. Turn on the power, then turn on the air switch in the electric cabinet , then turn the ‘’Power’’ Switch on the control panel. The machine will be ready for operation test and adjustment after it is powered
and self-examined.