Zhengzhou Yishang Machinery Equipment Co., Ltd.

Home >> News

Operation precautions and maintenance instructions for automatic dry mortar production line

2023-03-26

Operation precautions and maintenance instructions for automatic dry mortar production line

2.jpg


Operation precautions and maintenance instructions for automatic dry mortar production line
1. All machines must be started in no-load state. It is forbidden to start at full load!
2. Butter must be beaten every 3-7 days on all the parts that need butter!
3. Clean all the machines after they stop running after work, especially the circuit and air path must be blown clean with air gun!
4. All machines once found abnormal sound, stop in time to check, do not force boot!

 

Zhengzhou Yishang Machinery Equipment Co., Ltd. is engaged in the research and development of dry powder mixing machinery design and manufacturing, my company R & D design and production of powder mortar production line complete sets of equipment; Professional production series of equipment: dry powder mortar mixer, putty powder mixer, biaxial blade mixer, plow knife mixer, automatic metering and packaging scale, pulse dust collector and other new stand-alone equipment, as well as sand dryer,


Our company specializes in providing design, installation and commissioning, and according to each customer's different conditions and requirements (investment scale, plant conditions, material type, logistics, product formula, etc.), to provide professional and reasonable solutions. If customers encounter any problems in the process of installing dry mortar equipment, they can contact our after-sales staff at any time.

 

Contact us:

https://www.drymortarmachinery.com

zzyishang.en.alibaba.com

whatsapp/TEL:+8615137127837

E-mail: [email protected]

 

Whatsapp:+8615137127837

WechatID:+8615137127837

Email:[email protected]

Alibaba Store:
https://zzyishang.en.alibaba.com

Sitemap

+8615137127837 +8615137127837 [email protected] Alibaba Store