Simple Dry Mortar Production Line 3-4 T/H Tile Adhesive Mix Making Machine

Above is an introduction and installation demonstration of the simple dry mortar production line 3-4 T/H tile adhesive mix making machine

 

Precautions for operation and use:
1. Power on the stirring host should be turned on first, and the stirring host is strictly prohibited from starting with load. Next, open a hoist, after the power can be fed. The stirring machine sets its own time according to the nature of the material used by its customers. After the stirring is finished, open the power supply of the secondary hoisting machine and open the manual butterfly valve at the discharge port of the main machine.
2. After the materials enter the finished product warehouse, open the manual valve under the finished product warehouse, open the automatic packaging machine, and pack.
3, daily maintenance: reducer regular refueling, it is best to replace once half a year, check the oil level within half a year, not enough position in time to supplement. The bearing at both ends of the host machine and the screw feeder add butter once a week.

 

Tools and spare items required for installation:
1. One 100A three-phase four-wire plastic-case circuit breaker (connected to the main gate), two 63A three-phase micro-circuit breakers (connected to the main engine and air compressor), two 40A three-phase micro-circuit breakers (connected to two elevators), one 4P micro-circuit breaker 40A (connected to the packaging machine), 6 square single-core copper wire 10 meters for serial connection of each switch, One small electric box (400*500*200), four 10mm expansion screws, one percussion drill, one 10mm drill bit, 1m guide rail, 12-14, 14-17, 19-22, 22-24 open box wrench, one 250mm adjustable wrench, 10m iron wire, one hand pliers, one wallpaper knife, one flat-head Phillips screwdriver each, 2 rolls of electrical tape, a barrel of butter, a butter gun, a 0.9m3/min air compressor (joint matching), 10mm plastic transparent gas pipe 30m, a quick gas pipe three-way, two sets of iron 10mm gas pipe joint, a blow (wind) gun, 2 rolls of raw material.
2. The connecting wire of the main engine motor is 4 square three-core copper wire, the one-time screw elevator electromechanical electromechanical wire is 2.5 square three-core copper wire, the packaging electromechanical electromechanical wire is 2.5 square four-core copper wire. Cable according to the position of the machine and the power bus distance
3, the reducer of the stirring host if it is cycloidal needle reducer, then you need to buy 46# oil (antiwear hydraulic oil) 4 liters two barrels.

 

Contact us:
Our company design and production of dry powder mortar production line complete equipment; Professional production series of equipment: dry powder mortar mixer, putty powder mixer, biaxial blade mixer, plow knife mixer, automatic metering and packaging scale, pulse dust collector and other new stand-alone equipment, as well as sand dryer, quartz sand dryer, river sand dryer and a series of equipment. These equipment has been widely used in construction, building materials, chemical industry, powder, mortar, paint, metallurgy, environmental protection and other industries in the first-class enterprises, and won the majority of users praise!
Our company provides design, installation and commissioning, and according to each customer's different conditions and requirements (investment scale, plant conditions, material type, logistics, product formula, etc.), to provide professional and reasonable solutions.

Whatsapp:+8615137127837

WechatID:+8615137127837

Email:[email protected]